This is the building we were working on. In about six weeks the construction went from a concrete slab to the building up, the inside walls built, the electrical wiring done, and the drywal mostly completed. All the inside work was completed with volunteers at only a cost of a few meals and a place to sleep for our crews and a place to park their motor homes for the framers and drywallers.
This would be the sound booth switches which is where the other end of the wires that I was working on in the the attic go. This is just the power wires there still have to be the load wires, as it's called, which would go to different sets of lights, the baptistry, and anything else electrical in the sanctuary. The sound booth is the hub of everything in the sanctuary. So the next time to pass by a church sound booth this is was is behind the drywall surrounding the booth.
We had a great time even though the group was a small 7 people this time.