The chapel in Kansas City really caught me by surprise. My mind's vision of a chapel was a some what small place where folks go to pray and meditate on God's word. This however is huge compared to what I had envisioned in my mind.
Our team's task was to work on the electrical and get the heating system working as cold days were coming soon. Ron had the job of working in the boiler room which was pretty tight. Getting everything wiried up was a difficult task as all the wiring had to be inside conduit. All the curves and bends to make this happen turned out to be quite challenging.
The outside crew was given the task to run the conduit from the main breaker panel to all five of the airconditioning units. Once again bending and anchoring skills came into play. This was a two week project that I only could stay for one week.
My task was to help plumber with the insulating of the water pipes. Once again I was high up in the attic and crawl spaces known only to plumbers and electricians. I floated around and got involved with drywall, actual plumbing, and some electrical work. Our crew was 24 one of the largest in a while.
.
The outside distribution boxes were definitely a challenge and took most of the time for our crew during the first week. Fortunately the weather co-operated and gave the outside crew fabulously warm days to accomplish their task. By the end of the first week most of the outside conduit was complete. I have no doubt that by the end of the second week heat was available to the building.